Riyadh Metro Line 3 is the longest line of the six-lines, with 41.8Km, identify as the orange line and will across the capital city of the Kingdom of Saudi Arabia.
Assembly of cladding and standing seam system in the terminal metro West Depot.
Started: August 2016